Technical Documentation

Technical drawings NS264

Technical drawings provide supporting documentation for Ausgrid's Network Standards.

161887_sht1 (114kb)    Standard construction lightning spire earth bar details

162013_sht1 (2Mb)    Standard construction lightning spire and floodlighting 2 light assembly general arrangement

162293_sht1 (321kb)    Standard construction 15m, 18m and 20m lightning spire footing details

162611_sht1 (434kb)    Standard construction steel flange mounted lightning spire earthing details

162812_sht1 (321kb)    Standard construction 7m light pole and 12m lightning spire footing details

163028_sht1 (149kb)    Standard construction steel flange mounted lightning spire floodlighting design crossarm details.

169818_sht1 (1Mb)    Standard construction lightning spire and floodlighting 4 light assembly general arrangement

202164_sht1 (161kb)    Outdoor substations reinforced block work transformer bay walls wall mounted lightning mast arrangement and details

202369_sht1 (210kb)    Standard construction 66kV switching station lightning spire and overhead earth wire details

211846_sht1 (124kb)    Outdoor substations reinforced block work transformer bay walls wall mounted lightning mast 6m spire

215497_sht1 (195kb)    Standard yard construction steel flange mounted lightning mast concrete pad footing detail

516894_sht1 (278kb)    Standard construction substations - type 2 pole mounted lightning spire construction details